1Abdel Razik Kandeil, Dean of graduate studies at the Arab academy for science, Technology and Maritime Transport with extensive multinational experience in industrial engineering. He can be reached at arkandeil@gmail.com.
2Mohamed K. Hassan, Assistant professor at the Arab Academy for science, Technology and Maritime Transport. Worked for multinational companies around the world, and then joined the department of Industrial and Management Engineering department at the academy. He can be reached at mkhassan@aast.edu.
3Eng. Amany El Sayed Nady, Project manager at Alexandria Construction Company, Egypt, one of the biggest construction companies in the Middle East. He can be reached at amanynady@hotmail.com.
Unlike any other industry, construction industry has not fully implemented TQM philosophy. This can be attributed to the complex nature of construction projects, which has numerous and overlapping activities. The present research is an attempt to solve one of the major problems in large construction projects, manifested in the delay of handing-over apartments to end customer in contracted time. The DMAIC procedures of the Six Sigma, problem-solving methods together with the CPM and PERT project planning techniques have been integrated in this research to achieve the required objective.
Construction Management, Process Improvement, Six Sigma, TQM, CPM, PERT
JEL CLASSIFICATION: L74
Anbari V. (2002), “Six Sigma Method and its Applications in Project Measurement, Proceedings of the Project Management Institute Annual Seminars and symposium”, San Antonio, Texas.
Bechtel Corporation . (2008), “Six Sigma, Improving Quality and efficiency is the way we work”, http://www.bechtel.com/six_sigma.html.
Burati J., Mattews M., and Kalidindi S. (1994), “Quality Management in Construction Industry.” Journal of Construction Engineering and Management, ASCE, 117 (2), 341-359.
Culp G., Smith G., and Abbott J. (1993), “Implementing TQM in Consulting Engineering Firm” , Journal of Management in Engineering, ASCE, 9(4), 340-366.
Figenbaum A. (1991), “Total Quality Control, Revised”, New York, N.Y, U.S.A., 3rd Ed, McGraw-Hill Professional Publishing.
Harry M., and Schroededer R. (2000), “Six Sigma, The Breakthrough Management Strategy Revolutionizing the World’s Top Corporations”, Currency Doubleday, New York.
Hassan H. (2004),”Factors for Quality Management Improvement in Egypt”. Master Thesis, College of Engineering and Technology, Arab Academy for Science and Technology and Maritime Transport.
Love P., Li H., Irani Z,, and Holt G. (2000), “Re-thinking TQM: Toward a Framework for Facilitating Learning and Change in Construction Organization”, The TQM Magazine, 12(2), 107-116.
McClusky R. (2000), “The Rise, Fall, and revival of Six Sigma”, Measuring Business Excellence Journal, 4 (2), 6-17.
Pheng L. and Wei P. (1996), “Applying TQM in construction industry”, The TQM Magazine 8 (5), 39–46.
Snee R. (1999), “Why should statisticians pay attention to Six Sigma?”, Quality Progress.
Syed A., Aoieong R. and Tang S.L. (2005), “A Comparison of Quality Management Systems in the Construction Industries of Hong Kong and USA,” International Journal of Quality & Reliability Management, 22 (2), 149-161.
Thomas V, and Robert M. (2005), “Lean Six Sigma Logistics”, Strategic Development to Operational Success, J. Ross Publishing, Inc., 1(1), 5-9.
Trobica Z., (1999), “Impact of Total Quality Management on Home Buyer Satisfaction.” Journal of Construction Engineering and Management, ASCE, 125(3), 198-203.